Does NexGen handle both residential and commercial new construction?
Yes. Residential and commercial projects follow different planning, documentation, fixture, equipment, coordination, and approval paths, so each project should begin with the correct service page and current project documents.
Is plumbing rough-in a separate service?
Rough-in is one phase of a larger plumbing package. It depends on plans, underground work, fixture specifications, framing, testing, inspections when applicable, and responsibility for final fixture and equipment connections.
Can NexGen review a phase-specific rough-in request?
A phase-specific request may be reviewed when the existing underground work, plans, testing status, fixture information, responsibility boundaries, remaining work, and approval process can be clearly documented.
What is included in new-construction plumbing?
The approved scope may include plan review, underground plumbing, water piping, drainage, venting, gas piping, rough-in, top-out, fixture connections, equipment connections, testing, documentation, and project coordination.
What documents are needed for an estimate?
Provide the current plumbing drawings, architectural plans, specifications, fixture and equipment schedules, addenda, alternates, scope requirements, requested dates, and responsibility information.
Can NexGen price a project from fixture counts alone?
Fixture counts may support early budgeting, but final pricing also depends on locations, specifications, pipe routes, equipment, access, utilities, project phases, testing, schedule, and responsibility boundaries.
Who provides the fixtures and equipment?
Fixture and equipment purchasing responsibilities should be stated in the project documents or approved proposal. NexGen should not assume that all fixtures or equipment are contractor-furnished.
Does NexGen handle excavation and concrete?
Excavation, backfill, compaction, concrete cutting, concrete repair, and slab work are included only when specifically listed in the written approved scope.
Who handles permits and inspections?
Permit and inspection responsibilities should be identified before work begins. NexGen does not assume responsibility for every permit, fee, inspection, or third-party test unless specifically included.
What happens if the plans change?
Revised plans, substitutions, added fixtures, deleted fixtures, equipment changes, and field directives should be documented and reviewed for scope, pricing, responsibility, and schedule impact before the work changes.
What happens if another trade covers plumbing before it is tested?
NexGen should be notified immediately. Reopening, exposing, retesting, repairing, or documenting prematurely covered work may require additional scope, scheduling, and approval.
Does NexGen set every appliance and piece of equipment?
Only the fixtures, equipment, and plumbing connections specifically included in the written approved scope are included. Equipment movement, electrical work, HVAC work, manufacturer commissioning, and specialty installation may remain with others.
Can the project be completed in phases?
Yes. The plumbing scope may be divided into underground, building areas, floors, rough-in phases, equipment phases, final connections, and punch-list work when the plans, access, schedule, and responsibilities support phased construction.
How are additional costs approved?
The project should identify an authorized decision-maker and change process. NexGen should document the condition, proposed work, cost, and schedule impact before proceeding beyond the existing authorization.
Should I call NexGen about a construction project?
Yes. Call with the available project information when you need plan review or an estimate. Mention any scheduled construction phase, active leak, damaged piping, gas concern, or immediate site condition that requires prompt coordination.